Mobile DI Units Prevent Shutdown Case Study

August 21, 2017

Mobile DI Units Prevent Shutdown Case Study

View Full Case Study

MPW’s mobile deionization units prevent shutdown at auto manufacturing plant

Problem
When a production plant for a large automotive manufacturer in Michigan suddenly faced the problem of losing its ability to produce ultra-pure water, MPW quickly provided the solution. One of two pumps in the plant’s permanent Reverse Osmosis (RO) system failed. Without ultra-pure water, the plant could not properly prepare its auto chassis for the painting process. The replacement pump was on backorder and had to be shipped from China. With a delivery date three months out, the auto maker called MPW’s Industrial Water Division emergency-response number. The plant was able to rely on its storage tank while MPW’s units were in-transit. Within 12 hours, MPW delivered Mobile Deionization (DI) trailers, preventing the line from shutting down.

Solution
While the plant’s system operated at approximately half its previous capability, MPW’s DI units were each able to produce 1 million gallons of ultra-pure water every 10 days. MPW was able to keep a trailer onsite and operational for the three-month period.
MPW’s DI units are twice as large as its competitors’ trailers, which increases efficiency by limiting switch-outs.

Results
Delivery and implementation of MPW’s units went off without a glitch, despite the fact that it was the first time the Industrial Water Division sent Mobile DI trailers to this location. MPW safely produced approximately 13 million gallons of ultra-pure water for the site over the three-month time frame. Most important, automotive production lines ran uninterrupted and the manufacturer was able to produce thousands of cars during MPW’s emergency response. MPW literally saved its client millions of dollars.